Total Pageviews

Showing posts with label golfing. Show all posts
Showing posts with label golfing. Show all posts

Tuesday, 2 July 2013

First solar breaks ground in Mexico

First Solar Breaks Ground on Largest Solar Power Plant in Texas

EL PASO, Texas & TEMPE, Ariz. & SANTA FE, N.M.--(BUSINESS WIRE)--El Paso Electric Power, The New Mexico State Land Office and First Solar, Inc announced today that construction has commenced on what will be the state’s largest solar power plant, located on State Trust Land near Deming in Luna County.

While in the construction phase, the Macho Springs Solar Project will provide approximately 300 jobs. Construction is expected to be completed by May of 2014, and the active power plant will include three operational and maintenance jobs.

“This is a milestone for not only El Paso Electric, but our customers and this region,” said Tom Shockley, El Paso Electric Chief Executive Officer. “We look forward to the continued growth of this technology in a cost effective manner.”

“This solar power project will provide clean, efficient solar power for use by New Mexicans,” said New Mexico State Land Commissioner Ray Powell. “Also, it benefits the local and regional economy include millions of dollars in direct and indirect economic benefits, and about 300 temporary construction jobs, while at the same time earning money for our public schools, universities, special schools, and hospitals.”

Under a 20-year power purchase agreement between El Paso Electric and First Solar, the 50MWac project will generate enough clean energy to power more than 18,000 average customer homes in the El Paso Electric service territory. The project will displace more than 40,000 metric tons of CO2, the equivalent of taking 7,500 cars off the road, and will displace more than 340,000 metric tons of water consumption annually.

“First Solar values the support and leadership provided by El Paso Electric and the New Mexico State Land Office for this project,” said Michael Hatfield, First Solar Director of Project Development. “The Macho Springs Solar Plant will be an exciting addition to the region’s renewable energy resources.”

The project represents a system resource for El Paso Electric Company as the Company will purchase the entire output power from the Macho Springs solar power project to serve its New Mexico and Texas service territory. This project was secured by El Paso Electric through an all-source competitive Request for Proposal process conducted in 2011. The project will operate on a commercial lease from the State Land Office on about 500 acres of land at Macho Springs, near Deming. First Solar also has an interconnection agreement with El Paso Electric.

Wednesday, 1 February 2012

SOLAR GOLF CART -MAKE SURE YOU DONT BREAK DOWN BEFORE THE 19th HOLE

Imagine..... A Golf Car With A Solar Powered Charging System That Charges Itself During Play
Your electric golf cart can be fitted to use our solar charging system. You'll save on your utility costs +++ you will contribute to reducing your solar footprint in an environmentally friendly way.


Fit this 37W solar kit to your golf cart and you'll extend your battery range (going further on one mains charge). You'll also save money on reduced charging costs and battery replacements (this kit will help to extend your battery life).
How will solar power extend your golf cart battery life?
  • Golf cart batteries are typically drained (during use) by about 80% of their charge. This is known as a deep discharge. At this point the battery has to be recharged. A discharge and recharge is known as a charge cycle. After approximately 520 charge cycles the battery will be nearing its end of life and your cart will need a new battery. This could happen within a year and a half.
  • With a PowerFilm PowerDrive solar panel charging the battery, maximum drain is down to about 65%. This improves the life of the battery to a minimum of 730 charge cycles. Even better, typical battery drain is between 30% and 50%, which means battery life can be more than doubled. (30% drain means the battery will last for 1,800 charge cycles or 4 and 3/4 years).
What about the panel?
  • There are no brackets, this flexible panel has a "Peel and Stick" Butyl Backer
  • Peel and stick means no holes to drill in your golf cart roof
  • There's no heavy glass or chunky frame - this is a lightweight, low profile, weatherproof and durable panel
  • The panel installs in minutes
  • The solar cell technology used makes for an efficient operation even in low light levels (perfect for the UK).
Commercial benefits for golfing centres:
  • The number 1 complaint is when a cart doesn't last the 18 holes. Solar power will make sure the cart gets around the course and back for the nineteenth hole.
  • Less recharging time on mains power means significantly lower electricity bills
  • Solar power will need less manpower for cart maintenance. Replacing a discharged cart by shuffling others around can tie up three carts and a couple of staff.
  • Solar power will reduce cart downtime. More carts available to your golfing customers.
Specifications:
  • Complete with all components & cables needed for a simple self install
  • Power: 37W
  • Voltage: The panel produces 15.4V and the controller (included in the kit) boosts this to 48V
  • Solar Panel Dimensions (Opened Out): 26.25" x 51.3", 0.667m x 1.3m
  • Charge Controller Dimensions: Approx 4" x 2" x 2" (101mm x 51mm x 51mm)
  • Charge Controller Weight: 1.8lbs (0.82kg)

PRICE  £999.00


Contact Ace Solar Power Today for further information or to place your order 01277 651529

Short Video on Powerfilm Solar Golf Cart.